Vadodara
+918690924755

'pond rejuvenation project'

Items tagged with 'pond rejuvenation project'

product image
Rainwater collection Pond

Water Conservation, Ground Water Rejuvenation and Development via Rainwater Management and Harvesting Rainwater through Ponds and Borewell Recharging Structures to Support Increasing Demand of Water for Daily usage for Domestic, Industrial and Agricultural purposes. Water Conservation and Harvesting Structures in Naturally Water Scarce Regions creates Geo-Hydrological Opportunity and Economic Viability. Ponds recharging structure, farm pond, stop Dam, and small pond etc. It is seen that different Geographical Location and unique Geophysical and Hydrological Nature and every situation needs to be addressed, separately, the groundwater recharge capacity of the varies regions may vary depending upon area specific geophysical nature of earth strata. Recharge Wells provide an opportunity to extract sub-surface flow of the region without exploiting the Groundwater reserve.

Send Message
product image
Rainwater collection Pond

Earthen Pond An earthen pond is an artificial lake or pond created by shaping and building an earthen or dirt embankment around a depression or low-lying area. These ponds are commonly used for recreational or ornamental purposes and can also serve as water sources for livestock or irrigation. Regular Monitoring: Keep an eye on water levels. Debris Removal: Clean out leaves, branches, and other debris. Aquatic Vegetation Control: Manage plant growth. Long-Term Sustainability: With care, earthen ponds can thrive as safe habitats for both wildlife and humans

Send Message
product image
Water Flow Meter

The Woltman Type Flow Meter by Allegiance India™ is a high-precision, heavy-duty water meter designed for large-scale water consumption measurement. Ideal for industrial, commercial, and municipal applications, this meter features a horizontal turbine (Woltman) mechanism that ensures accurate and efficient water flow monitoring even under high-pressure conditions. Key Features: ✅ Woltman Type with Horizontal Turbine – Ensures high accuracy and durability ✅ Flanged End Connection – Easy installation in pipelines ✅ Magnetic Transmission – Reduces wear and increases operational lifespan ✅ ISO 4064 Certified – Complies with global accuracy and quality standards ✅ Low-Pressure Drop – Efficient water flow measurement with minimal resistance ✅ Corrosion-Resistant Body – Durable construction for long service life ✅ Available in Multiple Sizes – Ranges from 50mm to 600mm Applications: 🏭 Industrial Water Supply – Manufacturing plants, chemical industries 🏢 Commercial & Municipal Water Distribution – Smart city projects, large buildings 🚰 Irrigation Systems – Efficient water management for agriculture 💧 Water Treatment Plants – Accurate monitoring of treated water supply

Send Message
product image
Rain Water Harvesting System

“Injection well “ New & Innovative Technology for Rainwater Harvesting System Products that are precisely coordinated, scientifically designed all-in-one Rainwater Harvesting solutions and dedicated service. 'Allegiance Water Management ' also undertakes turnkey projects in corporate sector/ industries/ government undertaking etc. and is capable of handling large projects right from Rain Water Harvesting design, supply and installation to providing end- to-end solutions. 'Allegiance' is equipped with a dedicated and experienced team of engineers, technician, workmen along with special installation equipment's, drilling rigs, civil structures etc. Highly trained technical team conducts the Rainwater Harvesting technical survey by studying the layout of the site and building. Existing piping system of rainwater and storm drains are studied. Gradient and landscape of the site and building are obtained. Designing and installation of innovative customized system is done with precise scientific approach. These solutions include: diverting existing rainwater pipes, deployment of underground storage, auto pumping system, piping, filtering, storage, utilization etc. Designing and construction of ground water recharging structures. Complete solutions for water neutrality establishment projects.

Send Message
product image
Rain Water Harvesting System

Percolation Pit is also like Rainwater Harvesting System A percolation pit, in its most low-tech form, is a simple hole dug into the ground. It facilitates groundwater recharge through infiltration of surface runoff into the soil or rock. Differences to contour trenches: Better water storage capability due to greater depth. Percolation tank is an artificially created surface water body, submerging in its reservoir a highly permeable land so that surface runoff is made to percolate and recharge the ground water storage. The percolation tanks are mostly earthen dams with masonry structure only for spillway. Percolation tank is an artificially created surface water body, submerging in its reservoir a highly permeable land so that surface runoff is made to percolate and recharge the ground water storage. Percolation tank should be constructed preferable on second to third order streams, located on highly fractured and weathered rocks which have lateral continuity down stream. The recharged area down stream should have sufficient number of wells and cultivable land to benefit from the augmented ground water. The size of percolation tank should be governed by percolation capacity of strata in the tank bed. Normally percolation tanks are designed for storage capacity of 0.1 to 0.5 MCM. It is necessary to design the tank to provide a ponded water column generally between 3 & 4.5 m. The percolation tanks are mostly earthen dams with masonry structure only for spillway. The purpose of the percolation tank is to recharge the ground water storage and hence seepage below the seat of the bed is permissible. for dams upto 4.5 m. height, cut off trenches are not necessary and keying and benching between the dam seat and the natural ground is sufficient.

Send Message
product image
Water Flow Meter

Digital water flow meter as per CGWA Compliance ELECTROMAGNETIC FLOW METER Digital Flow Meter With Telemetry As Per CGWA Guidelines Installation of Digital Water Flow Meter on Ground water abstraction structures Whereas the Central Government constituted the Central Ground Water Authority (hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000 and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of Environment & Forests, for the purposes of regulation and control of ground water development and management in the whole of India and to issue necessary regulatory directions. And whereas the Authority has issued ‘Guidelines to control and regulate ground water extraction in India’ vide notification number 3289(E) dated 24th September, 2020, wherein under Section 9 (i) “Installation of digital water flow meter (conforming to BIS/ IS standards) having telemetry system in the abstraction structure(s) shall be mandatory for all users seeking No Objection Certificate and intimation regarding their installation shall be communicated to the CGWA within 30 days of grant of No Objection Certificate through the web-portal.” THIS IS TO BRING TO THE NOTICE OF ALL GROUND WATER USERS THAT: All the project proponents/users drawing ground water and seeking/having NOC shall have to mandatorily install tamper-proof digital water flow meters with telemetry on all the ground water abstraction structures within their premises. All the Micro and Small Enterprises drawing less than 10 cum/day shall also be mandatorily required to install digital water flow meters on all the ground water abstraction structures within their premises. Such enterprises shall be subjected to randomised inspections. The afore-mentioned conditions need to be strictly followed by all the users and any ground water withdrawal without the installation of tamper-proof digital water flow meters and telemetry (wherever applicable) shall be construed as illegal. Non-compliance of these conditions shall invite a Penalty provision and/or Environmental Compensation against the proponent for illegal withdrawal of ground water as per the CGWA Guidelines and may result in cancellation/rejection of NOC and sealing of ground water abstraction structures.

Send Message
product image
CGWA NOC Permission Service

CGWA Clearance Central Ground Water Board (CGWB) . Statement indicating position of pending cases received for NOC for ground water withdrawal. Statement showing list of project proposals to whom NOC for ground water withdrawal has been issued. The annual replenishable ground water resources availability plays an important role in defining the guidelines. The latest assessment of the state wise ground water resources as on 31.03.2009 is available at the Central Ground Water Board . As per the ground water resource estimates of 2009, out of the 5842 assessment units (Blocks, Mandals, Talukas, districts), 802 over-exploited units, 169 critical units, 523 semi-critical units, 4277 safe units and 71 saline units have been identified across the country by Central Ground Water Board. The Annual replenishable ground water resources have been estimated as 431 Billion Cubic Meters (bcm). The Net Ground Water Availability is 396 bcm and the overall stage of ground water development of the country is 61%. Therefore, prior permission/NOC from CGWA has to be obtained before construction of any Groundwater abstraction structure viz. Tube wells, Bore wells, Dug wells etc. Allegiance can offers its client the following services: Examining the area of the groundwater against availability Water requirement Availability of aquifer A Shallow aquifer B Deeper aquifer Status of the groundwater development of the area Preparation of proposal for augmentation of groundwater abstraction Preparation and implementation of water conservation measures Facilitation for obtaining NOC from CGWA, New Delhi

Send Message

Still searching for
pond rejuvenation project?