Vadodara
+918690924755

'polluted first'

Items tagged with 'polluted first'

product image
Rainwater Harvesting System

Injection well Technology is the most effective in capturing surface run off both from plain open loose area or from storm line and filtering in two stages by filtering rainwater through 4 stages of filtration through Silt Trap and Injection well. The silt traps takes care of most impurities in the first stage itself, as it has 40 mm gravels, 10 mm pebbles, charcoal, activated carbon and coarse send and horizontally fixed V wire non clogging SS screen of 500 mm length and 150 mm dia. Rainwater then flows through main Injection well where it flows by gravity through 40 mm gravels, 10 mm pebbles, charcoal, activated carbon and coarse send and vertically placed V wire non clogging SS screen of 500 mm length and 200 mm dia. on the recharge bore well. Air vent from bore well and main well is kept at center. The main well is designed to do maintenance whenever is required. As such the filtration media only needs cleaning once in a year Silt Trap and Injection well. The best technology to have head pressure by the way of water column to ensure fast recharge of ground water and recover the water levels in Aquifer. Allegiance water Management; India's passionate Rainwater Company.

Send Message
product image
Borewell Drilling Services

Water well Drilling Machine, Water well DTH drilling machines & Drilling Rig Machine Water Well Drilling Services water well drilling services throughout India. The company owns 25 water well drill rigs with a capacity to bore 30 meters to 300 meters deploying compressor of 1500 cfm/400 psi. Chiefly utilized for water well drilling, our rig fleet allows customization based on client requirements. Recharge Well Drilling Services. Methods and techniques for ground water recharge. Types of Soil tests for building construction works depend on properties of soil. Design of the foundation is based on soil test report of construction site. Soil tests for construction of buildings or any structure is the first step in construction planning to understand the suitability of soil for proposed construction work. Soil which is responsible for allowing the stresses coming from the structure should be well tested to give excellent performance. If soil shouldn’t tested correctly then the whole building or structure is damaged or collapsed or leaned like leaning tower of Pisa. So, soil inspection or testing is the first step to proceed any construction Allegiance Water Management www.allegianceindia.in Email : info.allegianceentp@gmail.com Contact : 8690924755 ; 9408425896

Send Message
product image
Rooftop Rainwater Harvesting Filters

Rooftop Harvesting Filters. FL 200/250 (Rooftop Area upto 2500 Sq.ft.) The characteristic features of FL Series Dual Intensity Rain Water Harvesting Filter is its capacity to take up the load up to 10 to 225 square meters of roof area with variable intensity of rainfall of 5 to 75 mm/hour with a discharge capacity of 10 to 225 liters per minute. This filter can be conveniently used for harvesting rainwater for individual households, schools, apartments, institutions, and commercial buildings of medium sizes. • Item Code: FL-200 Suitable up to area: 225 SQMTRS Max: Intensity of Rainfall: 75 mm/hr Working Principle : Cohesive Force & Centrifugal force Operating Pressure: Less than 2 feet of head (0.060kg/cm2) Capacity: 225 LPM Filter Element: SS-304 Screen Mesh Size: 250 Microns Inlet: 110 MM Clean Water Outlet: 75 MM Drain Outlet: 90 MM Housing: High Density Polyethylene Efficiency of Filter: Above 90% Source of Power: Gravity

Send Message

Still searching for
polluted first?