Vadodara
+918690924755

'new goals'

Items tagged with 'new goals'

product image
Rain water Harvesting

"Injection well " New & Innovative Technology for Rainwater Harvesting System Products that are precisely coordinated, scientifically designed all-in-one Rainwater Harvesting solutions and dedicated service. 'Allegiance Water Management ' also undertakes turnkey projects in corporate sector/ industries/ government undertaking etc. and is capable of handling large projects right from Rain Water Harvesting design, supply and installation to providing end- to-end solutions. 'Allegiance' is equipped with a dedicated and experienced team of engineers, technician, workmen along with special installation equipment's, drilling rigs, civil structures etc. Highly trained technical team conducts the Rainwater Harvesting technical survey by studying the layout of the site and building. Existing piping system of rainwater and storm drains are studied. Gradient and landscape of the site and building are obtained. Designing and installation of innovative customized system is done with precise scientific approach. These solutions include: diverting existing rainwater pipes, deployment of underground storage, auto pumping system, piping, filtering, storage, utilization etc. Designing and construction of ground water recharging structures. Complete solutions for water neutrality establishment projects.

Send Message
product image
Piezometer (Digital Water Level Recorder) - DWLR

Allegiance Water Level Indicator Flat tape water level Indicator Enhanced Laser Marked Tape Features Durable PVDF non-stretch tape Improved electrical properties Thicker dog bone design prevents clinging to sides of the well Permanently laser marked every 1/100 ft or each mm The PVDF flat tape is laser marked every 1/100 ft or each mm; lengths up to 5000 ft (1500 m). New flat tape has increased tensile strength and electrical efficiency by using 6 strands of copper coated stainless steel and 13 strands of stainless steel in each conductor. The P7 Water Level Meter Probe is engineered to allow submersion to 1000 ft. (300 m). Sensor at the tip of the probe provides

Send Message
product image
CGWBNOC

CGWA Clearance Central Ground Water Board (CGWB) . Statement indicating position of pending cases received for NOC for ground water withdrawal. Statement showing list of project proposals to whom NOC for ground water withdrawal has been issued. The annual replenishable ground water resources availability plays an important role in defining the guidelines. The latest assessment of the state wise ground water resources as on 31.03.2009 is available at the Central Ground Water Board . As per the ground water resource estimates of 2009, out of the 5842 assessment units (Blocks, Mandals, Talukas, districts), 802 over-exploited units, 169 critical units, 523 semi-critical units, 4277 safe units and 71 saline units have been identified across the country by Central Ground Water Board. The Annual replenishable ground water resources have been estimated as 431 Billion Cubic Meters (bcm). The Net Ground Water Availability is 396 bcm and the overall stage of ground water development of the country is 61%. Therefore, prior permission/NOC from CGWA has to be obtained before construction of any Groundwater abstraction structure viz. Tube wells, Bore wells, Dug wells etc. Allegiance can offers its client the following services: Examining the area of the groundwater against availability Water requirement Availability of aquifer A Shallow aquifer B Deeper aquifer Status of the groundwater development of the area Preparation of proposal for augmentation of groundwater abstraction Preparation and implementation of water conservation measures Facilitation for obtaining NOC from CGWA, New Delhi

Send Message

Still searching for
new goals?