Vadodara
+918690924755

'company focuses'

Items tagged with 'company focuses'

product image
Rainwater Harvesting System

Injection well Technology is the most effective in capturing surface run off both from plain open loose area or from storm line and filtering in two stages by filtering rainwater through 4 stages of filtration through Silt Trap and Injection well. The silt traps takes care of most impurities in the first stage itself, as it has 40 mm gravels, 10 mm pebbles, charcoal, activated carbon and coarse send and horizontally fixed V wire non clogging SS screen of 500 mm length and 150 mm dia. Rainwater then flows through main Injection well where it flows by gravity through 40 mm gravels, 10 mm pebbles, charcoal, activated carbon and coarse send and vertically placed V wire non clogging SS screen of 500 mm length and 200 mm dia. on the recharge bore well. Air vent from bore well and main well is kept at center. The main well is designed to do maintenance whenever is required. As such the filtration media only needs cleaning once in a year Silt Trap and Injection well. The best technology to have head pressure by the way of water column to ensure fast recharge of ground water and recover the water levels in Aquifer. Allegiance water Management; India's passionate Rainwater Company.

Send Message
product image
Borewell Drilling Services

Water well Drilling Machine, Water well DTH drilling machines & Drilling Rig Machine Water Well Drilling Services water well drilling services throughout India. The company owns 25 water well drill rigs with a capacity to bore 30 meters to 300 meters deploying compressor of 1500 cfm/400 psi. Chiefly utilized for water well drilling, our rig fleet allows customization based on client requirements. Recharge Well Drilling Services. Methods and techniques for ground water recharge. Types of Soil tests for building construction works depend on properties of soil. Design of the foundation is based on soil test report of construction site. Soil tests for construction of buildings or any structure is the first step in construction planning to understand the suitability of soil for proposed construction work. Soil which is responsible for allowing the stresses coming from the structure should be well tested to give excellent performance. If soil shouldn’t tested correctly then the whole building or structure is damaged or collapsed or leaned like leaning tower of Pisa. So, soil inspection or testing is the first step to proceed any construction Allegiance Water Management www.allegianceindia.in Email : info.allegianceentp@gmail.com Contact : 8690924755 ; 9408425896

Send Message

Still searching for
company focuses?