Surat
+918690924755

'second one'

Items tagged with 'second one'

product image
Rain Water Harvesting System

Geophysical survey for Rainwater Harvesting, a number of years of experience and technical knowledge we are able to provide you the most suitable locations to drill a Borewell on your site. By using technically advanced equipment like Resistivity meters & Electromagnetic (EM) VLF instruments we provide high quality service with excellent execution. Before any Rainwater Harvesting System construction is done, we help you in identifying the nature of Soil Structure & what is the actual Depth to recharge Rainwater.

Send Message
product image
Rain Water Harvesting System

It is a shallow excavated trench filled with gravel or crushed stone that is designed to infiltrate stormwater though permeable soils into the groundwater aquifer. A percolation trench is similar to a dry well, which is typically an excavated hole filled with gravel. we are engaged to offer the best Percolating Well Service. The provided service is executed using the progressive techniques under the supervision of our brilliant professionals. Offered service is highly demanded among our clients, owing to their various associated features like promptness and on time execution.

Send Message
product image
Rain Water Harvesting System

‘V’ Wire Injection Well Technology to Recharge Groundwater Source: • The Rain Water is lead through water channel and first reaches the silt trap, which allows for silt to accumulate in the chamber. The overflow water is lead into the injection well, passing through multilayer’s of Filtration media placed at the top of the injection well. The water is accommodated in a specially designed storage well, which creates water column, injecting large quantities of water into the deeper layers of the semi impervious earth’s strata through the Non Clogging V-Wire screens attached to the specifically designed percolator pipe, placed to a depth of 30 meters below the ground. The water column and the dual V-Wire Screen allow for the water to reach the dry joints, cracks, aquifers and recharge the ground water source. • This technology does not employ moving parts; the assured life span of the material is a minimum of twenty years. The maintenance cost involves desalting of the silt trap and replacement of filtration media once in five years. • The technology was adaptable to harvest rain water, irrespective of the presence of any bore well in place and also irrespective of terrain. The technology gave maximum flexibility to be used either in low lying areas or in upland conditions. • All materials used in this Technology are eco-friendly and recyclable. • Technology works on the Gravitational Principal Geomorphic profiling through vertical electrical Sounding of the soil strata is done to ascertain enormous quantity of water, quickly penetrating the rainwater into groundwater source. • The Provisioning of silt Trap fitted with Horizontal V wire Screen Filter eliminated the need of periodic maintenance and also facilitating significant volumes of rainwater to get into the recharging well.

Send Message
product image
Rain Water Harvesting System

Percolation well is Known as Rain Water Harvesting System It is a shallow excavated trench filled with gravel or crushed stone that is designed to infiltrate stormwater though permeable soils into the groundwater aquifer. A percolation trench is similar to a dry well, which is typically an excavated hole filled with gravel. we are engaged to offer the best Percolating Well Service. The provided service is executed using the progressive techniques under the supervision of our brilliant professionals. Offered service is highly demanded among our clients, owing to their various associated features like promptness and on time execution.

Send Message
product image
V Wire screen

The all-welded wedge wire screens are made from two elements the V-shaped wedge wire is helically wound around an array of internal longitudinal support rods. Each intersection of wire and rods is automatically resistance welded, creating a very strong cage-like cylinder with one continuous slot spiraling along its full length. The gap between the wires, also called slot or aperture, is manufactured to customer specification, allows water to flow from the surrounding aquifer into the screen, The slots can be very narrow to keep out fine sand grains, which could otherwise damage your pump through abrasion. NON PLUGGING SLOTS V-shaped wire creating, two point particle contact preventing plugging. Inwardly opening slots (in-flow) preventing sand particles from remaining lodged in screen. The V-shaped wire enhances well efficiency, ensures consistent pumping and long well life. LARGE OPEN AREA The continuous slot wedge wire offers higher open area than any other type of screens used for water well applications, such as slotted pipe, punched pipe, louver screens. Wedge wires for each application are selected to maximize open area, resulting in the lowest possible cost for water extraction. TECHNICAL DETAILS Available sizes from 1“ (25 mm) to 22“ (560 mm) Water well screens designed to suit well depth Available in slots sizes from 0.15 mm to 3 mm Length up to 6 metres available Materials: LCG (Low Carbon Galvanised) / SS304 / S316L / SS316 / SS316L - or as required to meet Customer requirements. End fittings - to suit Customer requirements

Send Message
product image
V Wire screen

V -WIRE FILTER SCREEN V-Wire Filter Screen/ Rainwater Filters are the best Rainwater Harvesting Filters which are used for Filtration purpose. These filters have Continuous slots, which are Non Choking & Non Clogging and makes Filtration process smooth. There is no wastage of rain water after using this RWH filter. V -WIRE SCREENS is a Proven Product of Proven Technology Trusted Widely for RAINWATER HARVESTING. we are proud to Offer one of the Most Modern Filtration Systems for Rainwater Harvesting (Absolutely Zero Maintenance Cost) with the sole aim of increasing awareness about the Long Term benefits of Rainwater Harvesting using Filter Screens instead of the Conventional Method normally adopted. V-Wire Screen Filter“/ Rainwater Harvesting Filter Screen is a Highly Acceptable Modern Technology in Rain Water Harvesting. It eliminates conventional filtration system, SAVES -Precious Space, Construction Cost and Construction Time for Filtration Tank. Scientific Design helps Cleaning Very Easy and SAVES Maintenance Cost.

Send Message
product image
Water level Recorder

Allegiance Water Level Indicator Flat tape water level Indicator Enhanced Laser Marked Tape Features Durable PVDF non-stretch tape Improved electrical properties Thicker dog bone design prevents clinging to sides of the well Permanently laser marked every 1/100 ft or each mm The PVDF flat tape is laser marked every 1/100 ft or each mm; lengths up to 5000 ft (1500 m). New flat tape has increased tensile strength and electrical efficiency by using 6 strands of copper coated stainless steel and 13 strands of stainless steel in each conductor. The P7 Water Level Meter Probe is engineered to allow submersion to 1000 ft. (300 m). Sensor at the tip of the probe provides

Send Message
product image
Water Flow Meter

Digital water flow meter as per CGWA Compliance ELECTROMAGNETIC FLOW METER Digital Flow Meter With Telemetry As Per CGWA Guidelines Installation of Digital Water Flow Meter on Ground water abstraction structures Whereas the Central Government constituted the Central Ground Water Authority (hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000 and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of Environment & Forests, for the purposes of regulation and control of ground water development and management in the whole of India and to issue necessary regulatory directions. And whereas the Authority has issued ‘Guidelines to control and regulate ground water extraction in India’ vide notification number 3289(E) dated 24th September, 2020, wherein under Section 9 (i) “Installation of digital water flow meter (conforming to BIS/ IS standards) having telemetry system in the abstraction structure(s) shall be mandatory for all users seeking No Objection Certificate and intimation regarding their installation shall be communicated to the CGWA within 30 days of grant of No Objection Certificate through the web-portal.” THIS IS TO BRING TO THE NOTICE OF ALL GROUND WATER USERS THAT: All the project proponents/users drawing ground water and seeking/having NOC shall have to mandatorily install tamper-proof digital water flow meters with telemetry on all the ground water abstraction structures within their premises. All the Micro and Small Enterprises drawing less than 10 cum/day shall also be mandatorily required to install digital water flow meters on all the ground water abstraction structures within their premises. Such enterprises shall be subjected to randomised inspections. The afore-mentioned conditions need to be strictly followed by all the users and any ground water withdrawal without the installation of tamper-proof digital water flow meters and telemetry (wherever applicable) shall be construed as illegal. Non-compliance of these conditions shall invite a Penalty provision and/or Environmental Compensation against the proponent for illegal withdrawal of ground water as per the CGWA Guidelines and may result in cancellation/rejection of NOC and sealing of ground water abstraction structures.

Send Message
product image
Rain Water Harvesting System

Percolation Pit It is a shallow excavated trench filled with gravel or crushed stone that is designed to infiltrate stormwater though permeable soils into the groundwater aquifer. A percolation trench is similar to a dry well, which is typically an excavated hole filled with gravel. we are engaged to offer the best Percolating Well Service. The provided service is executed using the progressive techniques under the supervision of our brilliant professionals. Offered service is highly demanded among our clients, owing to their various associated features like promptness and on time execution.

Send Message

Still searching for
second one?